Sungai Perai, Penang: Integrated River Basin Management (IRBM)

IRBM is defined as the coordinated management of resources in natural environment (air, water, land, flora and fauna) based on river basin as a geographical unit/area with the objective of balancing man’s needs with necessity of conserving resources to ensure their sustainability.


Penang Drainage Masterplan: Batu Kawan Industrial Park 2 (BKIP 2)

The Penang Development Corporation (PDC) has engaged Perunding Pinang Sdn Bhd as Consultant to study and prepare the Drainage and Storm Water Management Master Plan for Batu Kawan Industrial Park 2 (BKIP 2), Byram, Mukim 11, Seberang Perai Selatan, Pulau Pinang.


Bukit Mertajam Wet Market: Structure Forensic Study & Restoration Works

The Bukit Mertajam Wet Market building was razed by fire and partially destroyed by the blaze. The Seberang Perai Municipal Council has appointed PPSB to conduct a forensic study on the building’s skeletal structure and its overall condition to measure the full extent of the fire damages. PPSB was also tasked with the restoration of the building’s core structures and support columns.  



Masjid Permatang Bogak:
Design & Build

PPSB has been tasked with the overall design & construction of a new mosque for a small town of Permatang Bogak, Seberang Perai, Penang. The mosque’s design is a based of a modern mosque design, with a 110ft minaret tower laced with intricate Islamic elements complementing the mosque’s facade. The Permatang Bogak mosque will be a notable landmark to the locality as well as a religious congregational place for local Muslim worshippers.


Forensic Structural & Building
Integrity Auditing

A Forensic Structural Audit is an overall health and performance checkup of a building like a doctor examines a patient. It ensures that the building and its premises are safe and have no risk. We analyses and suggests appropriate repairs and retrofitting measures required for the buildings to perform better in its service life.




Flood Mitigation Planning & Management

Our flood mitigation planning & management services include strategic flood risk assessment based on as-built drawings and on-site analysis to evaluate flood risk across the extent of the studied area. Once vulnerable flood zones has been determined, our team will propose the required flood mitigation approaches and strategies to be implemented.


Proposed Mini Biogas
Power Plant

PPSB has partnered with a German tech company Snow Leopard Projects GmbH to test run a prototype design of a mini biogas power plant in USM. This mini biogas plant system is developed to optimize regional organic waste management and usage of renewable raw material. This system uses various feedstock like organic waste, agricultural waste as well as food production residues and different kinds of renewable materials for power generation.


Caged In-Situ Septic Tank
(CISST) System for Water Villages

This CISST System was introduced and proposed by PPSB for the sole purpose of solving the problem of rural water villages – they have poor drainage or are not connected to the mains sewage network septic tanks that allow safe disposal of wastewater. Hence, this CISST System is a sustainable and an inexpensive solution to solve the problem since these habitations are not land-based and situated remotely from urban sewage networks. 


Optimizing Removal Efficiency of On-site Sewage Treatment [2022]

Department of Sewage Services Malaysia (JPP) has commissioned PPSB to propose an upgrade to current communal IST (Individual Septic Tanks) systems, seeking for a better IST solution capable of treating sewage complying to Standard A effluent of the Environmental Quality Act 1974. Simultaneously, the solution must be commercially viable, efficient, durable and reliable.

Implementation of Green Technology Awareness for Schools

This CISST System was introduced and proposed by PPSB for the sole purpose of solving the problem of rural water villages – they have poor drainage or are not connected to the mains sewage network septic tanks that allow safe disposal of wastewater. Hence, this CISST System is a sustainable and an inexpensive solution to solve the problem since these habitations are not land-based and situated remotely from urban sewage networks. 


Our Recent Projects
[ 2021 / 2022 ]
Lembaga Kemajuan Wilayah Pulau Pinang (PERDA)

Pembangunan Pusat Aktiviti Sosial dan Komersial Sungai Rusa, Balik Pulau, Daerah Barat Daya, Pulau Pinang.

Consultancy Fees

RM 337,000.0

Status

New Award

Institut Penyelidikan Hidraulik Kebangsaan Malaysia (NAHRIM)

Perkhidmatan Bagi Pelaksanaan Kajian Kebolehlaksanaan Pembinaan Wetland Sebagai Alternatif Kepada Sistem Pembentungan

Consultancy Fees

RM 500,000.00

Status

New Award

Jabatan Landskap Negara (JLN)

Cadangan Pembangunan Taman Awam Wawasan (Vision Park), Pulau Pinang.

Consultancy Fees

RM 350,00.00

Status

New Award

M.E.I Consultant

Sub-consultancy Services For Flood Mitigation Hydraulic Specialist, Hydrologist & GIS Expert For - Rekabentuk Terperinci Rancangan Tebatan Banjir Teluk Bahang, Daerah Barat, Pulau Pinang.

Consultancy Fees

RM 85,000.00

Status

New Award

Awan Aset Sdn Bhd

Penyingkiran Bahan Cemar Oleh Tumbuhan Tanah Bencah Di Dalam Iklim Tropika


Consultancy Fees

RM 47,500.00

Status

New Award

Perunding Kejuruteraan ARMI

Design And Construct The Proposed Resurfacing Of Runway And Its Associated Works At Langkawi International Airport, Kedah Darul Aman

Consultancy Fees

RM 20,000.00

Status

New Award

Jabatan Perkhidmatan Pembentungan (JPP)

Perkhidmatan Perundingan Bagi Kajian Optimizing Removal Efficiency of On-Site Sewage Treatment System to Standard A Effluent.


Consultancy Fees

RM 282,786.00

Status

New Award

Institut Penyelidikan Hidraulik Kebangsaan Malaysia (NAHRIM)

Kajian Kebolehlaksanaan Pembinaan Wetland Sebagai Alternatif Kepada Sistem Pembentungan (Luar Bandar)

Consultancy Fees

RM 570,000.00

Status

New Award

Takdir Permai Sdn Bhd

Projek Klinik Kesihatan Jenis 2 (KK2) Bandar Perda, Bukit Mertajam, Seberang Perai Tengah, Pulau Pinang

Consultancy Fees

RM 38,500.00

Status

New Award

Majlis Bandaraya Ipoh (MBI)

Cadangan Kajian Kebolehlaksanaan Membaikpulih Kolam Rekreasi di Taman Rekreasi Dr. Seenivasagam Off Jalan Raja Musa Aziz, Ipoh, Perak.


Consultancy Fees

RM 86,000.00

Status

New Award

TDEM

A Study On Potential Of Implementing Renewable Energy For Malaysian Electrical Power Producers

Consultancy Fees

RM 38,300.00

Status

New Award

Galaksi Bebas Sdn Bhd

Cadangan Mendirikan 1 Blok Rumah Pangsapuri Mewah 13-Tingkat Dengan 1 Paras Besmen (51 Unit) Di Atas Lot 2825 (Lot Lama 1353), Jalan Cantomment, Seksyen 1, Bandar Georgetown, Daerah Timur Laut, Pulau Pinang.

Consultancy Fees

RM 32,800.00

Status

New Award

Our List of Projects
Lembaga Urus Air Selangor (LUAS)

Kajian Fi Bagi Aktiviti Pengubahan Sumber Dan Penyediaan Garis Panduan / Amalan Pengurusan Terbaik (BMPs) Selaras Dengan Enakmen LUAS 1999

Consultancy Fees

RM 196,149.80

Status

Completed

Perbadanan Kemajuan Negeri Kedah (PKNK)

Cadangan Menaiktaraf Sistem Saliran Bandar Dan Kolam Tadahan Di Kawasan Perindustrian Pknk, Bukit Kayu Hitam, Kedah Darul Aman 


Consultancy Fees

RM 169,921.00

Status

Completed

Jabatan Pengairan dan Saliran (JPS) Kedah

Kajian Kejuruteraan Dan Rekabentuk Terperinci Bagi Rancangan Tebatan Banjir, Bukit Kayu Hitam, Kedah Darul Aman



Consultancy Fees

RM 469,140.00

Status

Completed

Majlis Perbandaran Seberang Perai (MPSP)

Kajian Kejuruteraan Dan Rekabentukk Terperinci Bagi Rancangan Tebatan Banjir, Machang Bubuk, Bukit Mertajam.


Consultancy Fees

RM 250,000.00

Status

Completed

Private Client - Hospital

Proposed Hospital IT System



Consultancy Fees

RM 1,000,000.00

Status

Completed

Jabatan Perkhidmatan Pembentungan (JPP)

Projek Kajian Penggunaan Sistem Pembetungan Yang Sesuai Untuk Kampung Air - ‘Caged In-situ Septic Tank’


Consultancy Fees

RM 270,735.00

Status

Completed

Lembaga Pembangunan Langkawi (LADA)

Cadangan Menaiktaraf Air Terjun (Langkawi Falls) Jalan Datai, Langkawi, Kedah Darul Aman


Consultancy Fees

RM 56,187.86

Status

Completed

Jabatan Pengairan dan Saliran (JPS)

Consultancy Services For The Detailed Design Of Bio-drain And Wetland For The Eco-friendly Water Quality Improvement Works For Sg. Batu Ferringhi & Sg. Satu 


Consultancy Fees

RM 223,289.80

Status

Completed

Jabatan Perkhidmatan Pembentungan (JPP)

Projek Kajian Social Impact Study - ‘Caged In-situ Septic Tank Clan Jetty’


Consultancy Fees

RM 250,000.00

Status

Completed

Jabatan Kerja Raya (JKR) Pulau Pinang

Proposed Forensic Investigation Of 6 Units Flats, Jalan Mohd Saad, Butterworth, Penang.


Consultancy Fees

RM 100,000.00

Status

Completed

Pejabat Pembangunan Pulau Pinang (ICU JPM)

Projek Membina Baru Masjid Permatang Bogak, Di Atas Lot 3908 & 3909, Mukim 8, Seberang Perai Utara, Pulau Pinang.


Consultancy Fees

RM 500,000.00

Status

In Progress

Jabatan Landskap Negara (JLN)

Cadangan Pembangunan Taman Awam Wawasan (Vision Park), Pulau Pinang


Consultancy Fees

RM 304,655.95

Status

In Progress

Penang Development Corporation (PDC)

Kajian Pelan Induk Sistem Perparitan Di Taman Perindustrian Batu Kawan 2 (BKIP2). Byram, Mukim 11, Daerah Seberang Perai Selatan, Pulau Pinang.


Consultancy Fees

RM 728,818.90

Status

In Progress

Yayasan Hijau Malaysia

Program Sekolah Tunas Hijau 


Consultancy Fees

RM 300,000.00

Status

In Progress

Jabatan Pengairan dan Saliran (JPS) Perak

Kajian Morfologi Sungai Perak Dan Kesan Operasi Pasir Di Daerah Perak Tengah, Perak Darul Ridzuan


Consultancy Fees

RM 350,000.00

Status

In Progress

Perbadanan Kemajuan Negeri Kedah (PKNK)

Cadangan Menaiktaraf Sistem Perparitan Di Kawasan Perindustrian Kuala Ketil, Kedah Darul Aman


Consultancy Fees

RM 51,000.00

Status

Completed

Jabatan Pengairan dan Saliran (JPS) Pulau Pinang

Penyediaan Pelan Induk Saliran Dan Pengurusan Air Ribut Bagi Daerah Barat Daya, Pulau Pinang


Consultancy Fees

RM 485,187.75

Status

Completed

Hospital Universiti Sains Malaysia (HUSM)

Cadangan Membina Tempat Letak Kereta Bertingkat Temasuk Kedai, Gelanggang Futsal, Rumah Kelab Serta Pavilion, Di Hopital Universiti Sains Malaysia, Kubang Kerian, Kelantan.


Consultancy Fees

RM 750,000.00

Status

Completed

Private Client

Proposed Mini Biogas Power Plant.



Consultancy Fees

RM 3,000,000.00

Status

Completed

Kastri Engineers Sdn Bhd

Projek Membina Jalan Dari 2 Lorong Ke 4 Lorong Di Jambatan Tunku Abdul Rahman Hingga Jambatan Merdeka, Seberang Perai Utara, Pulau Pinang.


Consultancy Fees

RM 110,240.00

Status

Completed

Think City Sdn Bhd

Producing A Sungai Perai Rehabilitation Study.



Consultancy Fees

RM 105,000.00

Status

Completed

Majlis Perbandaran Seberang Perai (MPSP)

Cadangan Pengukuhan Struktur Tingkat Satu Pasar Besar, Pasar Awam Bukit Mertajam


Consultancy Fees

RM 82,568.00

Status

Completed

Kementerian Industri Asas Tani Malaysia (MOA)

Pengubahansuaian Struktur Ibu Bekalan Dan Terusan Utama Bagi Mengatasi Masalah Pemendapan Di Terusan Pengairan, Rancangan Pengairan Changkat Jong, Daerah Hilir Perak - Sediment Sampling


Consultancy Fees

RM 18,857.40

Status

Completed

JKP Sdn Bhd

Penyediaan Laporan Kajian Pasaran Kawasan Seberang Jaya & Permatang Pauh, Pulau Pinang.


Consultancy Fees

RM 10,590.00

Status

Completed

Kementerian Pendidikan Malaysia

Projek Menaiktaraf Sekolah Menengah Vokasional Kuala Kangsar Kepada Kolej Vokasional Kuala Kangsar, Perak.


Consultancy Fees

RM 371,837.75

Status

In Progress

Jabatan Pengairan dan Saliran (JPS)

Penyediaan Pelan Pengurusan Lembangan Sungai Bersepadu (IRBM) Sungai Perai, Pulau Pinang


Consultancy Fees

RM 1,750,000.00

Status

In Progress

Penang Development Corporation (PDC)

Kajian Pelan Induk Sistem Perparitan Untuk Penang Science Park South Dan East Batu Kawan


Consultancy Fees

RM 488,787.20

Status

In Progress

Railway Assets Corporation (RAC)

Cadangan Membina Baru Kawasan Letak Kereta Serta Kerja Berkaitan Di Stesen Keretapi Tasek Gelugor, Bukit Mertajam Dan Bukit Tengah


Consultancy Fees

RM 120,000.00

Status

In Progress

Yayasan Hijau Malaysia

Program Pembangunan Ilmu, Implementasi Dan Aktiviti Kesedaran Teknologi Hijau Sekolah Menengah Merentasi Kurikulum Dan Kokurikulum Bagi Pemantapan Pendidikan Lestari.


Consultancy Fees

RM 3,240,327.52

Status

In Progress